Introductory notes

Outline planning permission was granted in December 2006 for nearly 8 million sq ft of land to be called “King’s Cross Central”. This includes up to 25 large office buildings, 20 new streets, 10 new public spaces, the restoration and refurbishment of 20 historic buildings and structures, and up to 2,000 homes.

The development comprises zones, each with a code, displayed here. Some of the existing and proposed buildings are identified here.

The developers, Argent King’s Cross, provide fuller, interactive, maps, with descriptions of the buildings. They also produce a quarterly news letter that provides information about progress in the development.

The developers must apply for detailed planning permission for each part of the site, so planning processes, potentially including public consultations, must be followed before permission is granted. Responding with comments about the applications can be worthwhile even after the consultations have officially ended.

Almost all of the planning applications for King’s Cross Central are made to Camden Council. The planning reference number of the application in the system used by Camden Council typically takes the form yyyy/xxxx/P. The first four figures are the year; the following four identify the application and are issued consecutively through the year. The suffix ‘P’ means ‘general planning’; the suffix ‘L’ means ‘listed building application’.

To find details of an application and related documents, at Camden planning application searches put the full sequence of numbers and letters in the Application Number box directly under the heading ‘Search Criteria’ and press Return (Enter). This will typically produce one result, describing the application. Click on the planning reference number in that result to obtain a summary of the progress of the application. Click on ‘View Related documents’ at the bottom of that page to list the relevant documents.

The system used by Islington Council, at Islington planning application searches, is similar to that used by Camden Council, though its details are different.

Relevant posts

Forum response to Camden about Camden Council office block

The Forum submitted some comments to the Camden Development Control Committee meeting that was considering the planning application for Building B3, the new Council office block. That building also houses a library and swimming baths, so safe access to it … Continue reading

Posted in B3, Central developments | Leave a comment

Forum response to Camden about BNP Paribas office block

The Forum often does not respond to planning applications; instead its Planning Response Team provides comments that its members might find helpful when constructing their own responses. In this case, however, the Forum meeting on 22 September chose to make … Continue reading

Posted in B1, Central developments, Meeting minutes | Leave a comment

Forum response to the London Assembly review of community involvement in planning

At the Forum meeting on 22 September members discussed the draft response to the London Assembly consultation on community involvement in planning. The final response is here. The Forum meeting also heard from the architects of Building B1. It is … Continue reading

Posted in B1, Central developments, Meeting minutes, Neighbourhood planning | Leave a comment

Forum response to Camden about Building R5 of King’s Cross Central

A planning application for Building R5 of King’s Cross Central (along York Way to the north of R4) was submitted on 31 January.  It describes three blocks in the northern part of the site; the southern part of the site … Continue reading

Posted in Central developments, R5 | Leave a comment

Forum response to Camden about Zone J of King’s Cross Central

At the Forum meeting on 9 December members commented on the plans for Zone J of King’s Cross Central. The plans were submitted in a planning application shortly afterwards. The comments were then summarised for the Planning Response Team as … Continue reading