The full planning application for what is highly likely to be one of the most iconic buildings in the King’s Cross Central development, 1-3 Canal Street (designated Building T1 on the plans) is now online, along with all the related documents, here. The documents include architectural drawings, landscape drawings, and reports looking at the environmental sustainability, light, and urban design impacts.
1-3 Canal Street will comprise a new energy centre and electrical substation, a 417 space multi-storey car park, a multi-use games area, residential development totalling 102 units (48 private ownership, 34 social rented and up to 20 intermediate affordable), retail units cafes, and bars together with new areas of adjacent public space.